I agree. The company has not been able get sufficient answers out of the Mali Gov on multiple issues, and its now become that much of a shit show that the ASX is taking action... Stop the show.
The Mali Gov have a right to be disgruntled with the FFX circus and their attempt to just walk away from it. However it's now time to push back. Stop construction.
- Forums
- ASX - By Stock
- Ann: Suspension from Quotation - Listing Rule 17.3
I agree. The company has not been able get sufficient answers...
-
- There are more pages in this discussion • 109 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable