Kodal dont even hold a ML that is useful to their operation. The ML they had was for a flotation plant but they have changed plans and want to go the DMS route. This requires a ML ammendment that they have been waiting a year for but still dont have, but let's not let the truth get in the way of a good ramp.
Leo are fully permitted under the 2012 code and fully funded to production starting Q2 2024, big cash coming this way over the next 6 months, this ML nonsense and Morila crap will soon be a thing of the past as annoying as it currently is. Common sense will prevail.
- Forums
- ASX - By Stock
- Ann: Suspension from Quotation
Kodal dont even hold a ML that is useful to their operation. The...
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online