G1A 0.00% 5.9¢ galena mining limited

In the Quarterly they described pastefill plant delays. That...

  1. 2,997 Posts.
    lightbulb Created with Sketch. 1125
    In the Quarterly they described pastefill plant delays. That probably contributed to the dilution -- stopes need to be filled otherwise the hanging wall waste rock starts to fail. They can refine the stope design going forward to reduce the size and also they will want to look at the accuracy of the blast holes and grade control holes.
 
watchlist Created with Sketch. Add G1A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.