SYR 0.00% 34.0¢ syrah resources limited

Ann: Syrah Balama Graphite Project Update, page-6

  1. 83 Posts.
    lightbulb Created with Sketch. 13
    Project construction is 98% complete with remaining works for completion primarily relating to electrical and instrumental installation. Structural, Mechanical and Piping (SMP) and Electrical and Instrumental (E&I) contractor productivity improved through measures introduced after July, with SMP now materially complete.

    .....it's called INSTRUMENTATION, not instrumental!
 
watchlist Created with Sketch. Add SYR (ASX) to my watchlist
(20min delay)
Last
34.0¢
Change
0.000(0.00%)
Mkt cap ! $351.8M
Open High Low Value Volume
33.0¢ 34.8¢ 32.0¢ $4.547M 13.51M

Buyers (Bids)

No. Vol. Price($)
5 264607 34.0¢
 

Sellers (Offers)

Price($) Vol. No.
34.5¢ 93599 4
View Market Depth
Last trade - 16.10pm 26/06/2024 (20 minute delay) ?
SYR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.