PLS 1.02% $2.97 pilbara minerals limited

BHP in OD took three months to repair their ball mill how long...

  1. 446 Posts.
    lightbulb Created with Sketch. 46
    BHP in OD took three months to repair their ball mill how long is the wait, not just an off the shelf items. If it was a breakdown we didn't need to know, but a problem this big talk about sugar coating the truth!!!!
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.97
Change
0.030(1.02%)
Mkt cap ! $8.954B
Open High Low Value Volume
$3.01 $3.01 $2.96 $11.35M 3.783M

Buyers (Bids)

No. Vol. Price($)
56 299299 $2.96
 

Sellers (Offers)

Price($) Vol. No.
$2.97 31008 14
View Market Depth
Last trade - 11.08am 11/07/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.