TZN 0.00% 4.1¢ terramin australia limited.

Pretty ordinary NPV and IRR for the CAPEX. Interesting given...

  1. 281 Posts.
    lightbulb Created with Sketch. 88
    Pretty ordinary NPV and IRR for the CAPEX. Interesting given this is a fairly significant project, the forced change in mining method has impacted heavily. Tapping the traditional finance options for this project on those metrics is going to be very difficult.
 
watchlist Created with Sketch. Add TZN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.