    It's only been 22 months since the W-5 discovery.
    In that time, they managed to:
    1. Drill W-6
    2. Sort out the permits
    3. Design and engineer the plant
    4. Procure the equipment
    5. Sign a GSA

    And they're constructing the plant.
    Even if it takes till the end of the year, I reckon that's a quick timeframe.
    It's a 5 year GSA, so taking a few extra months to start delivering on it won't matter much in the long run.



    However - I'm disappointed in STX lack of proper updates when they realised the indicated timeframes would not be met. It'd been better if they had been more upfront about it.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.0¢
Change
0.000(0.00%)
Mkt cap ! $601.7M
Open High Low Value Volume
21.0¢ 21.5¢ 20.5¢ $1.313M 6.260M

Buyers (Bids)

No. Vol. Price($)
11 592504 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 748432 9
View Market Depth
Last trade - 16.10pm 18/10/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.