STX 2.27% 21.5¢ strike energy limited

It's only been 22 months since the W-5 discovery. In that time,...

  1. 646 Posts.
    lightbulb Created with Sketch. 226
    It's only been 22 months since the W-5 discovery.
    In that time, they managed to:
    1. Drill W-6
    2. Sort out the permits
    3. Design and engineer the plant
    4. Procure the equipment
    5. Sign a GSA

    And they're constructing the plant.
    Even if it takes till the end of the year, I reckon that's a quick timeframe.
    It's a 5 year GSA, so taking a few extra months to start delivering on it won't matter much in the long run.



    However - I'm disappointed in STX lack of proper updates when they realised the indicated timeframes would not be met. It'd been better if they had been more upfront about it.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
-0.005(2.27%)
Mkt cap ! $616.0M
Open High Low Value Volume
22.0¢ 22.5¢ 21.0¢ $4.542M 20.80M

Buyers (Bids)

No. Vol. Price($)
2 343465 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 563407 9
View Market Depth
Last trade - 16.10pm 27/09/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.