Tony, read the second paragraph of my post to which you have responded.
Do you care to respond to any of the points in my previous post?
I’m frustrated that the graphite stock I hold hasn’t already funded its graphite project. The original BFS of that company did not meet the stringent criteria of the Equator Principles and IFC Performance Standards, hence why an updated BFS was completed. I believe that company is now on the right path and will secure funding to develop its project. Do you know how Magnis will secure funding to develop Nachu?
- Forums
- ASX - By Stock
- Ann: Tanzanian Update on Nachu Graphite Project
Tony, read the second paragraph of my post to which you have...
-
- There are more pages in this discussion • 272 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
MNS (ASX) Chart |
Day chart unavailable