www.tangierspetroleum.com
Level 2, 5 Ord Street, West Perth WA 6005 PO Box 1674, West
Perth WA 6872 Australia Phone +61 8 9485 0990 Fax +61 8 9321 8990
ABN 80 072 964 179
ASX: TPT AIM: TPET
14
July
2014
TAO
-
1 Operational Update
Tangiers Petroleum Limited (ASX: TPT; AIM: TPET) (“Tangiers” or the “Company”) is
pleased to
provide an update on the drilling of the TAO
-
1
exploration
well, located
offshore Morocco.
N
o major operational issues have occurred
to date
and the well
is
expected
to intersect the Assaka
and Trident objectives within 60 days from spud, as
previously announced.
As the well has been designated as “tight”, no information related to depth or formation
will be provided during the drilling, beyond what is required by
the
ASX
and AIM
continuous disclosure
obligations
.
www.tangierspetroleum.com
Level 2, 5 Ord Street, West Perth WA 6005 PO Box 1674, West
Perth WA 6872 Australia Phone +61 8 9485 0990 Fax +61 8 9321 8990
ABN 80 072 964 179
ASX: TPT AIM: TPET
14
July
2014
Add to My Watchlist
What is My Watchlist?