AS2 2.13% 4.8¢ askari metals limited

Ann: Targeted Trenching Campaign Commences at Uis Project, page-2

  1. 548 Posts.
    lightbulb Created with Sketch. 158
    Hi,

    Economic Lithium hardrock resources are dependent on a lot of variables such as:

    - labour cost,
    - infrastructure
    - resource depth
    - resource size
    - cost of power
    and so on.

    Does anyone have an idea of what grade the resources in Namibia would start to become economic to mine?

    For example would 5 million tons @ 0.30% at or near surface economic?

    K
 
watchlist Created with Sketch. Add AS2 (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
0.001(2.13%)
Mkt cap ! $4.689M
Open High Low Value Volume
4.8¢ 4.8¢ 4.8¢ $344 7.184K

Buyers (Bids)

No. Vol. Price($)
1 44066 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 107896 1
View Market Depth
Last trade - 15.45pm 21/06/2024 (20 minute delay) ?
AS2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.