QPM 0.00% 3.3¢ queensland pacific metals limited

Ann: TECH Project Feasibility Study (amended), page-22

  1. 72 Posts.
    lightbulb Created with Sketch. 23
    Yep. I meant the majority of their off take sits in stage 2

    They didn’t do 6 months due diligence for 5 ktpa

    i was wondering what works could be completed in stage 1 which could assist stage 2 now knowing the space required has been secured ?


 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.