SUM 8.16% 22.5¢ summit minerals limited

I think the SP is geared more to the marginal nature of the...

  1. 94 Posts.
    I think the SP is geared more to the marginal nature of the project than any security issues.
    It is very sensitive to gold prices. The forecast for gold prices with the ever strengthening US dollar is closer to $1000 which makes this project marginal. Hence the stagnant interest.
    However on the bright side the underground mine at Belinau could be a treasure chest, only time will tell.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
-0.020(8.16%)
Mkt cap ! $18.46M
Open High Low Value Volume
23.0¢ 24.5¢ 22.5¢ $117.9K 508.9K

Buyers (Bids)

No. Vol. Price($)
5 76288 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 3500 1
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.