SMM 0.00% 0.4¢ somerset minerals limited

100% spot onThey have drilled 18 holes in 10 weeks, with 15...

  1. 2,324 Posts.
    lightbulb Created with Sketch. 347
    100% spot on

    They have drilled 18 holes in 10 weeks, with 15 submitted to lab, so 3 submitted every 2 weeks on average. First batch to lab were assays from 3 holes, so assuming they continue this trend then assays should be going t lab every 2 weeks and would expect results of them every 2 weeks. This is not to say they didn't submit these three earlier than expected due to the VG factor.

    In terms of turnaround time, the quarterly was released on 28th July. At that time the first 3 holes were being prepared for the lab, so turnaround time appears to be 6 weeks or so

    Additionally there may have been a slight delay in rechecking 500g/t assay, so perhaps less than 2 weeks til next report.

    Also expecting report on mill refurb and alteration study for B.
 
watchlist Created with Sketch. Add SMM (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $4.123M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
14 4960328 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2393458 3
View Market Depth
Last trade - 16.12pm 03/09/2024 (20 minute delay) ?
SMM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.