Hi Steve
Correct. It will still be qtrly report and paid 45 days after qtr then another 45 days before 4c give or take.
The difference is previously it was when it left pg warehouse so we were told. Therefore a sale to a distributing channel like coles.
Now it is said to be when it leaves the manufacturer. Question which manufacturer? As the are different stages.
Obj gets array manufactured and shipped to singapore. Singapore pg makes the wand. The wand is sent to china to be assembled into a gift set. Gift set is sent to warehouses around world.
So depending on start point 2 months to 6 weeks sooner recognition wise. Would be good to get clarification.
- Forums
- ASX - By Stock
- Ann: Term Sheet Executed for First Integrated Product
Hi SteveCorrect. It will still be qtrly report and paid 45 days...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WFL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.478M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WFL (ASX) Chart |
Day chart unavailable
The Watchlist
CC9
CHARIOT CORPORATION LTD
MD - Shanthar Pathmanathan, Geologist - David Trabert
MD - Shanthar Pathmanathan
Geologist - David Trabert
SPONSORED BY The Market Online