ADV 0.00% 13.5¢ ardiden ltd

Ann: Term Sheet to Fund, Design and Build Lithium Facility, page-228

  1. 1,592 Posts.
    lightbulb Created with Sketch. 289
    I'm just thinking out loud; would it be feasible to transport the raw material from Root Lake, Root Bay and Wisa Lake to the lithium processing plant in Seymour? All these sites are within roughly 700km of each other. Maybe that's why the plant at Seymour is being designed to process more raw material.

    Saving the trouble of building a plant at each location which probably wouldn't be feasible.
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
0.000(0.00%)
Mkt cap ! $8.439M
Open High Low Value Volume
13.5¢ 14.0¢ 13.5¢ $13.01K 93.71K

Buyers (Bids)

No. Vol. Price($)
2 11446 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 20000 1
View Market Depth
Last trade - 13.08pm 11/09/2024 (20 minute delay) ?
ADV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.