I think 4 is more than realistic. O1 initially flowed at more than 6; and on paper O2 should be more optimally positioned.
At 4 mmscf/d I'm getting 1.548 pj/a. MEL has a quarter share, so 0.387pj. Factor in 20% impurities and we have 0.09675 pj net to MEL per annum. At $13/gj that is $1.25m, so ~300k per quarter. That means 6mmscf/d = ~450k per quarter.
The flipside of that is that they'd only need 2mmscf/d to break even overall - noting that everything will decline.
- Forums
- ASX - By Stock
- Ann: Termination of Keybridge relationship
I think 4 is more than realistic. O1 initially flowed at more...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MEL (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.514M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 15464398 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 2626407 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 15464398 | 0.004 |
8 | 15262019 | 0.003 |
4 | 16775000 | 0.002 |
3 | 46300000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 2626407 | 4 |
0.006 | 4039880 | 6 |
0.007 | 2663797 | 4 |
0.009 | 615051 | 2 |
0.010 | 1000000 | 1 |
Last trade - 16.12pm 22/07/2024 (20 minute delay) ? |
Featured News
MEL (ASX) Chart |
Day chart unavailable