@Chalkyballs on the sections, the inferred resource can easily be converted to the measured/indicated category.
When we undertake mine level drilling and tighten the grid spacing, it'll also increase grade and resource size.
Got plenty of free kick wins aswell with the resource above 1.5g/t au cutoff that wasn't included in the resource.
I'm backing us to hit our aspirations to ultimately define 2Moz of inpit resource at Termera!
- Forums
- ASX - By Stock
- Ann: Ternera Mineral Resource increased by 66% to 1.1Moz
@Chalkyballs on the sections, the inferred resource can easily...
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TSO (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
-0.003(9.38%) |
Mkt cap ! $45.04M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 2.9¢ | $96.29K | 3.206M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 396896 | 2.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 382024 | 0.029 |
5 | 845714 | 0.028 |
2 | 630000 | 0.027 |
1 | 23076 | 0.026 |
3 | 800000 | 0.025 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 250000 | 1 |
0.032 | 1425762 | 2 |
0.033 | 23000 | 1 |
0.035 | 691131 | 5 |
0.036 | 980232 | 2 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
TSO (ASX) Chart |