In order to reduce costs and bang out results in a timely manner during different phases of exploration/feasibility/development etc sampling, labs use a cut-off grade (I think in this particlular case ALS labs are using 1% Cu initially) before re-analysing using another method.
I'm not saying that I'm necessarily expecting bonanza grades, just mulling over the possible reasons for delays besides the backlog of samples that labs are coping with throughout the world atm.
- Forums
- ASX - By Stock
- NWC
- Ann: Thick High-Grade Drill Results at the Antler Copper Deposit
Ann: Thick High-Grade Drill Results at the Antler Copper Deposit, page-31
-
-
- There are more pages in this discussion • 454 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.80M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 511179 | 1.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 1255585 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 511179 | 0.019 |
16 | 6864141 | 0.018 |
11 | 4455293 | 0.017 |
9 | 1078783 | 0.016 |
4 | 1823000 | 0.015 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 1255585 | 5 |
0.021 | 401044 | 3 |
0.022 | 885569 | 2 |
0.023 | 892857 | 4 |
0.024 | 3382925 | 5 |
Last trade - 08.51am 06/09/2024 (20 minute delay) ? |
Featured News
NWC (ASX) Chart |
Day chart unavailable