ADV 0.00% 14.0¢ ardiden ltd

Keep in mind the reasonably hilly terrain will add time for rig...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. M92
    392 Posts.
    lightbulb Created with Sketch. 1
    Keep in mind the reasonably hilly terrain will add time for rig moves, and also access roads and drilling pads will need to be prepared by construction crews for most holes (plus possibly land clearing). You can see the terrain is not exactly flat from the announcements where they took the surface samples (Q3/Q4 2016).

    Yes it takes longer to drill 140m vs 100m but the difference will be marginal (measured in a few hours, if that). It's important to take your time when conducting coring as the formation needs to be captured as slowly and as 'continuously' as possible with very few breaks. This is why some patience is required.

    The biggest influences on the variance between the hole drilling times will be the factors mentioned in the first paragraph.

    M92
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
(20min delay)
Last
14.0¢
Change
0.000(0.00%)
Mkt cap ! $8.752M
Open High Low Value Volume
14.0¢ 14.0¢ 14.0¢ $585 4.175K

Buyers (Bids)

No. Vol. Price($)
2 57482 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
13.5¢ 340 1
View Market Depth
Last trade - 15.34pm 15/11/2024 (20 minute delay) ?
ADV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.