Greenbushes lithium mine expansion
The current expansion is referred to as stage three and stage four expansions of the Greenbushes lithium mine. Conventional open-cut method of mining will be applied in the expanded areas.
The existing pits C1, C2, and C3 will be combined and expanded as a single open-pit by approximately 2.8km length, 1km width, and up to 450m depth. The mining rate will be increased to approximately 16 million bank cubic meters (Mbcm) for reaching the target of 9.5Mtpa of spodumene ore.
just reposting on something I posted somewhere else on something I watching but don't own because they getting grief on depth . 200-450 m is the sweet spot for me . not advice . shallow is dope too but we in Australia . deep and hard
not financial advice ever
2 double shot coffee deep already . no more today I am punching holes in my key board
- Forums
- ASX - By Stock
- VSR
- Ann: Thick stacked Pegmatite system emerging at Andrada prospect
Ann: Thick stacked Pegmatite system emerging at Andrada prospect, page-313
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VSR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $5.827M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $19.77K | 1.647M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 2256047 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 300509 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 2256047 | 0.012 |
8 | 1049458 | 0.011 |
5 | 720033 | 0.010 |
4 | 611113 | 0.009 |
2 | 620000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 300509 | 4 |
0.014 | 1659869 | 8 |
0.015 | 1949243 | 4 |
0.016 | 149680 | 3 |
0.017 | 175591 | 1 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
VSR (ASX) Chart |