This is now really getting exciting.
The 3.74m of massive sulphide mineralisation in a single interval is very good.
I think the testing of mineralisation in the wider area will be interesting to see.
They have also make an amendment to hole NDD0013 for their previous anns. That hole intersected 11.55m of strong magmatic sulphide mineralisation, including 3.35m of massive sulphides in five separate intervals.
Forward Plan:
- The RC rig will be drilling at VC1 for two to three weeks before demobilising to the Niobe Project to complete Lithium / Rubidium resource drilling at Aldoro’s tenement.
- The diamond rig has three holes to drill at VC1, before moving back to VC11 to test an off-hole nickel sulphide target there.
- A deep stratigraphic hole is also planned between VC3 and VC11.
- The High-Power Fixed Loop Electromagnetics (HPFTLEM) survey is continuing, screening for deeper or very conductive targets in the VC1, VC3, and VC11 areas
- Forums
- ASX - By Stock
- Ann: Thicker Zone of Massive Sulphide Intersected at VC1-Narndee
This is now really getting exciting.The 3.74m of massive...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARN (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.0¢ |
Change
-0.002(2.44%) |
Mkt cap ! $10.76M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 8.0¢ | $3.167K | 39.58K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 19000 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 19000 | 0.077 |
1 | 182758 | 0.076 |
3 | 192501 | 0.072 |
1 | 75000 | 0.070 |
1 | 160000 | 0.069 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 50000 | 1 |
0.081 | 10417 | 1 |
0.082 | 68488 | 1 |
0.083 | 2500 | 1 |
0.098 | 5000 | 1 |
Last trade - 12.49pm 08/08/2024 (20 minute delay) ? |
Featured News
ARN (ASX) Chart |