    Just did some quick back of the envelope stuff - 120 MT of copper produced in a three week period with a three day shut and then ramp up -

    allowing 1 day lost for the ramp up means 120 MT of copper produced in 17 days of production - so divide 120 by 17 days to get a daily production figure - and then multiply that by 21 days gives roughly 148 MT of copper production for a three week period.
 