STA 0.00% 9.5¢ strandline resources limited

Ann: Third Shipment of HMC Completed at Coburn Project, page-27

  1. PDT
    26 Posts.
    lightbulb Created with Sketch. 4
    The CSL Reliance in port now loading 30,000t HMC
    But it should be the Berge Hallasan which is a couple of hours out of Geralton due to load 10,000 HMC
    So looks like the 10,000 a month is running like clockwork so far
    Maybe next week for the announcement?
 
watchlist Created with Sketch. Add STA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.