SFX 5.08% 31.0¢ sheffield resources limited

The $27m is well and truly covered by the existing contingencies...

  1. 326 Posts.
    lightbulb Created with Sketch. 363
    The $27m is well and truly covered by the existing contingencies and cost overrun facility. In fact, even after the recently reported increase KMS still has in excess of $50m available in remaining cost overrun/contingencies.

    With only 25% of construction now remaining, and approximately half that covered by the fixed price contract with GR Engineering or already spent, I think SFX is in a pretty healthy position right now. They'd have to see cost blowouts of 100% on the remaining construction in order to use up their remaining available contingency.


    Last edited by BaliHai: 20/02/23
 
watchlist Created with Sketch. Add SFX (ASX) to my watchlist
(20min delay)
Last
31.0¢
Change
0.015(5.08%)
Mkt cap ! $120.4M
Open High Low Value Volume
29.5¢ 31.0¢ 29.5¢ $8.347K 27.33K

Buyers (Bids)

No. Vol. Price($)
1 1855 31.0¢
 

Sellers (Offers)

Price($) Vol. No.
31.5¢ 64 2
View Market Depth
Last trade - 12.58pm 12/08/2024 (20 minute delay) ?
SFX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.