my point was more that the originally allocated contingency will be used up. it always is and the lenders will assume it is when they look at cost to complete. the $27m cost increase can be funded out of the $40m cost overrun facility. so there is $13m free cash which is fine if things go perfectly to plan. if things slip though then there's no cash at the SFX level. the way they position the $54m contingency I think is a little cute IMHO and they've neatly played down the cost increase as nothing to see here.
anyway, let's hope they keep kicking goals and the SP is much higher soon enough!
DYOR
- Forums
- ASX - By Stock
- SFX
- Ann: Thunderbird Construction Over 75% Complete
Ann: Thunderbird Construction Over 75% Complete, page-25
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $116.4M |
Open | High | Low | Value | Volume |
29.5¢ | 29.5¢ | 29.5¢ | $1.666K | 5.648K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 80475 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 1315 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 45875 | 0.295 |
1 | 10500 | 0.285 |
1 | 50000 | 0.275 |
1 | 50000 | 0.265 |
1 | 40000 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.310 | 1315 | 1 |
0.320 | 14500 | 1 |
0.325 | 30769 | 1 |
0.350 | 8888 | 1 |
0.370 | 25000 | 1 |
Last trade - 10.09am 13/09/2024 (20 minute delay) ? |
Featured News
SFX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online