SFX 0.00% 29.5¢ sheffield resources limited

Ann: Thunderbird Construction Over 75% Complete, page-29

  1. 326 Posts.
    lightbulb Created with Sketch. 363
    Hi @2ic,

    Based on the presentation slide you have provided, the pre-production buffer nominally sits within the $20.4m listed as Working Capital - Indicative provision during start-up & commissioning.

    This $20.4m is a buffer (contingency if you like but poorly described on the presentation slide) and in addition to the pre-prod costs represented in the Stage 1 Upfront Capex (of $361m) in the lines labeled EPCM, Commissioning & Indirects of $49.9m and some of the items contained above Owners Costs (Ops Readiness, G&A and first fills. Site Prep, Mining Services Mobillisation) totalling $106.8m

    As @AX-E stated in post above, to try reconcile to the dollar the latest ASX release to these original presentation slides will prove difficult.

    https://hotcopper.com.au/data/attachments/5070/5070681-bfb9e4c0f28d5d5b605a8dca6929499a.jpg

    Last edited by BaliHai: 21/02/23
 
watchlist Created with Sketch. Add SFX (ASX) to my watchlist
(20min delay)
Last
29.5¢
Change
0.000(0.00%)
Mkt cap ! $116.4M
Open High Low Value Volume
29.5¢ 29.5¢ 29.5¢ $1.666K 5.648K

Buyers (Bids)

No. Vol. Price($)
3 80475 29.5¢
 

Sellers (Offers)

Price($) Vol. No.
31.0¢ 1315 1
View Market Depth
Last trade - 10.09am 13/09/2024 (20 minute delay) ?
SFX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.