Sheffield Resources PFS
"Overall zircon recovery, excluding semi-processed and re-circulated streams, is calculated at 67%. The Primary (66.4% ZrO2) Zircon comprises 80% of the recovered zircon. A Secondary (65.1% ZrO2) and a Special (62.8% ZrO2) Zircon were also produced. The HiTi84 product recovery, excluding semi-processed or re-circulation streams is 37%. Overall recovery of ilmenite to product is 65%. This product is an ilmenite with 49.1% TiO2 and is offset by a reduction in recovery to increase the TiO2 content and reduce Fe2O3 levels, resulting in a higher value product."
- Forums
- ASX - By Stock
- SFX
- Ann: Thunderbird Pre-feasibility Study Results
Ann: Thunderbird Pre-feasibility Study Results, page-38
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFX (ASX) to my watchlist
|
|||||
Last
33.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $131.7M |
Open | High | Low | Value | Volume |
35.0¢ | 35.0¢ | 33.0¢ | $23.83K | 70.52K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 66510 | 33.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 1000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 35000 | 0.335 |
1 | 33491 | 0.330 |
6 | 214281 | 0.320 |
3 | 52385 | 0.315 |
2 | 3800 | 0.310 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 1000 | 1 |
0.395 | 42000 | 1 |
0.420 | 30000 | 1 |
0.430 | 10000 | 1 |
0.455 | 14599 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
SFX (ASX) Chart |