Sheffield Resources PFS
"Overall zircon recovery, excluding semi-processed and re-circulated streams, is calculated at 67%. The Primary (66.4% ZrO2) Zircon comprises 80% of the recovered zircon. A Secondary (65.1% ZrO2) and a Special (62.8% ZrO2) Zircon were also produced. The HiTi84 product recovery, excluding semi-processed or re-circulation streams is 37%. Overall recovery of ilmenite to product is 65%. This product is an ilmenite with 49.1% TiO2 and is offset by a reduction in recovery to increase the TiO2 content and reduce Fe2O3 levels, resulting in a higher value product."
- Forums
- ASX - By Stock
- Ann: Thunderbird Pre-feasibility Study Results
Sheffield Resources PFS "Overall zircon recovery, excluding...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
29.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $115.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18 | 30.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.5¢ | 3000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18 | 0.300 |
2 | 52732 | 0.295 |
1 | 48000 | 0.290 |
1 | 2368 | 0.285 |
3 | 14560 | 0.280 |
Price($) | Vol. | No. |
---|---|---|
0.305 | 3000 | 1 |
0.320 | 3599 | 1 |
0.330 | 16000 | 1 |
0.340 | 44830 | 2 |
0.345 | 13128 | 1 |
Last trade - 16.12pm 09/08/2024 (20 minute delay) ? |
Featured News
SFX (ASX) Chart |
Day chart unavailable