TIG 0.00% 0.3¢ tigers realm coal limited

Just an addendum to the post above."Measures currently being...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 23,112 Posts.
    lightbulb Created with Sketch. 769
    Just an addendum to the post above.

    "Measures currently being considered include reviewing the location and number of coal loading points, investment in land-based port loading infrastructure, the construction, delivery and commissioning of two 500t barges to supplement the existing fleet of 100t barges and improving harbour dredging capabilities. Vessel scheduling and management practices are also under review in addition to the split of functions between TIG and the port operator/stevedore" (source Quarterly above) 
    The bottleneck was barge loading which also added to time in port for ships and extra freight charges for CFR sales.
    The commissioning of the two x 500 to barges with dredging of the loading area will have, IMO, a 3 fold effect:
    -Reduce costs for ship turn around time & increase ship loads.
    -reduce barging costs
    -lift the monthly sales/shipping rates.

    All we need is a shipping rate from mid June to the end  October of 1 ship a week ( averaging 34K ton) to hit 600K ton for the season. Anything more than that is a bonus, IMO. 40k ship loads would give us 720K ton, IMO.


 
watchlist Created with Sketch. Add TIG (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $39.20M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 1004636 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 2843079 6
View Market Depth
Last trade - 16.12pm 04/11/2024 (20 minute delay) ?
TIG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.