CEO Dr Andrew Tunks said. “The assay results to date are disappointing and not in line with our
expectations. Thick zones logged as disseminated sulphides have returned lower than expected values
for the target metals and where grades are reasonable, thicknesses are narrow and below minimum
mining widths. We await the results of the second two holes before formulating our future exploration
plans.
Clearly the material we have drilled is substantially different from the samples we collected from the
Tisová waste dumps. This points to a strong metal zonation within the Tisová orebody. We will
review the 3D model of the sulphides and look to investigate geophysical methods to identify further
sulphide bodies as a possible source of Co mineralisation in the dumps.
- Forums
- ASX - By Stock
- Ann: Tisova Co Au Cu Project Update - Czech Republic
CEO Dr Andrew Tunks said. “The assay results to date are...
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.64M |
Open | High | Low | Value | Volume |
1.9¢ | 2.0¢ | 1.9¢ | $21.99K | 1.155M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 1710033 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 115769 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 1710033 | 0.018 |
7 | 654705 | 0.017 |
3 | 1405888 | 0.016 |
2 | 75700 | 0.015 |
1 | 36000 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 115769 | 6 |
0.021 | 120000 | 2 |
0.022 | 50000 | 1 |
0.023 | 470000 | 2 |
0.025 | 50000 | 1 |
Last trade - 12.36pm 15/10/2024 (20 minute delay) ? |
Featured News
FBM (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online