Ann: Tivan plans for Ord River Hydro to power the Speewah Project, page-3

  1. 5,395 Posts.
    lightbulb Created with Sketch. 3786
    Good development - the company engaging with RIO means they are definitely on the radar of at least one big Australian.

    Transmission cost estimate - not sure - Will have to read the AEMO report - interested to see what capacity will be proposed - upsizing for potential future grid feed in always something to consider IMO - ie. if the company is successful - building their own solar farm & battery storage on site at Speewah overcapacity in future.
    transmission-cost-report.pdf (aemo.com.au)

    The LV line to El Questro is interesting - this is a popular tourist destination (glamping) - not sure what they run on but wouldn't surprise if it is diesel generators. Multiple customers means a PPA (off book transmission/grid connection) provided by Pac Hydro/Horizon would be ideal (at a minimum shared cost.)
    https://hotcopper.com.au/data/attachments/6138/6138087-57a6d5558eccf4210ab09a44ebdc8834.jpg
    Identifying a cost-effective & responsible power supply solution now critical in future feasibility of the project.
    I've certainly seen what happens to the SP & the company reputation when the company doesn't do this early in the piece.
    Last edited by Propunter2: 01/05/24
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
8.6¢
Change
-0.001(1.15%)
Mkt cap ! $178.9M
Open High Low Value Volume
8.9¢ 9.0¢ 8.6¢ $30.21K 343.1K

Buyers (Bids)

No. Vol. Price($)
1 29689 8.6¢
 

Sellers (Offers)

Price($) Vol. No.
9.0¢ 101537 2
View Market Depth
Last trade - 15.52pm 15/07/2025 (20 minute delay) ?
TVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.