The holes being drilled on Mongolia are 300 meters, not 2000 like in the PB.
Drilling 100s of these, as we’ve seen are much quicker and particularly over there in Mongolia
Furthermore, take a look at BLU, drilling in the Bowen basin. Has taken some time to dewater due to the care needed to look after the production coals.
Much patience required either way