PRE-FEASIBILITY STUDY CONFIRMS **ANINTHA AS A HIGH VALUE, RELATIVELY LOW RISK AND TECHNICALLY STRONG PROJECT.
STUDY BASED ON INDICATED MINERAL RESOURCE COMPONENT (21.6MT AT 0.9% V2O5) OUT OF GLOBAL MINERAL RESOURCE OF 119.9MT AT 0.8% V2O5.
DELIVERS MAIDEN PROBABLE RESERVE OF 16.7MT AT 0.96% V2O5.
PROJECT METRICS COMPARE VERY FAVOURABLY TO GLOBAL PEERS.
Column 1 Column 2 Column 3 0 {colgroup} 1 {col}{/col}{col}{/col}{col}{/col} 2 {/colgroup} 3 Targeted V2O5 Production Rate Tonnes Per Annum 13,000 4 Targeted Production Commencement Year 2021 5 Estimated Mine / Processing Life Years 13 6 Life of Mine Production Tonnes V2O5 129,000 7 Processing Rate Mtpa 1.6 - 1.9 8 Estimated mineralisation to be mined Mt 19.2 9 Average Diluted Mining Grade % V2O5 0.96 10 Average Strip Ratio 5.6
Column 1 Column 2 Column 3 0 {colgroup} 1 {col}{/col}{col}{/col}{col}{/col} 2 {/colgroup} 3 Commodity Price Forecast US$/lb V2O5 13 4 Exchange Rate Assumption A$: US$ 0.75 5 Total Revenue A$m 4,935 6 Total EBITDA A$m 3,070 7 Total Capital Expenditure A$m 380 8 Total Operating Expenditure A$m 1,600 9 Average Operating Costs US$/lb V2O5 4.27 10 Discount Rate Assumption % 10 11 Net Present Value (pre-tax) A$m 1,277 12 Internal Rate of Return (pre-tax) % 55 13 Net Present Value (post-tax) A$m 850 14 Internal Rate of Return (post-tax) % 43 15 Anticipated Payback on Capital Years 3.4
Ann: TMT Delivers robust **anintha pre Feasibility Study, page-3
Add to My Watchlist
What is My Watchlist?