TNC delivers 6,000 tonnes of copper oxide ore to the GAM plant in Cloncurry and assume as per JORC and allow for mining contamination, will be max of 0.6% Cu, which equates to 36 tonnes of copper metal which will make 144 tonnes of 25% copper sulphate. Assuming 100% recovery. Most heap leach's gets 70% max. Copper sulphate selling $US2,500 tonne. Why don’t TNC give these numbers so we all know?
144 tonnes x 70% recovery = 100 tonnes, x $US2,500 = $US250,000 or $A375,000.
We have no idea what it costed to mine and transport and crush and stack on heap or cost per tonne to produce Copper Sulphate through SX plant. What I can say with confidence is that there will be a new cap raise coming knowing what the probable costs are. So far I’ve been in the money with every post.
- Forums
- ASX - By Stock
- Ann: TNC delivers first oxide ore at Wallace North, Cloncurry
TNC
true north copper limited
Add to My Watchlist
1.43%
!
35.5¢

TNC delivers 6,000 tonnes of copper oxide ore to the GAM plant...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
35.5¢ |
Change
0.005(1.43%) |
Mkt cap ! $45.22M |
Open | High | Low | Value | Volume |
35.0¢ | 38.5¢ | 35.0¢ | $54.35K | 149.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 36.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
38.0¢ | 7041 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.360 |
1 | 25000 | 0.350 |
1 | 6353 | 0.340 |
1 | 50000 | 0.320 |
1 | 40000 | 0.290 |
Price($) | Vol. | No. |
---|---|---|
0.380 | 7041 | 1 |
0.390 | 8546 | 2 |
0.395 | 40000 | 1 |
0.400 | 17844 | 1 |
0.420 | 40000 | 1 |
Last trade - 15.17pm 20/06/2025 (20 minute delay) ? |
Featured News
TNC (ASX) Chart |