MAY melbana energy limited

Ann: Total depth called for Alameda-1, page-4

  1. 133 Posts.
    lightbulb Created with Sketch. 10
    Drilling at Alameda-1 Completed
    Highlights
    • Drilling of the Alameda-1 well stopped at 3,916 metres measured depth (mMD) / 3,694
    metres true vertical depth (mTVD) (predrill target total depth was 3,740 mTVD)
    • Continuous excellent oil shows while drilling over a gross interval of almost 300 mMD
    / 245 mTVD in this objective alone, accompanied by the highest pressures
    encountered to date in this well
    • A further significant influx of oil and gas into the well bore and increased pressure
    made calling total depth the prudent course of action, despite not having reached the
    bottom of the potential reservoir section
    • Drilling operations are now preparing to undertake electric logging which, depending
    on results, is currently expected to be followed by flow testing
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.3¢
Change
0.000(0.00%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $25.62K 1.135M

Buyers (Bids)

No. Vol. Price($)
8 1473358 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 153630 2
View Market Depth
Last trade - 13.39pm 04/07/2025 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.