"Planning on doing a "wiper trip" -
Assuming this is to clean the hole ready for sampling and provide the best achievable sample ?
Is this a very common practice ? "
Where a wireline logging job will extend over a significant length of time (usually >4 days) its common to perform a wiper trip halfway through the job. The most common reason I've run wiper trips is to cool the hole down in deep wells where the bottom hole temperature is getting close to the temp limits of the wireline tools.
As well as conditioning the borehole a wiper trip is also an opportunity to turn over the mud in the hole and adjust any mud properties if necessary.
- Forums
- ASX - By Stock
- IVZ
- Ann: Total Depth reached & additional zones of strong gas shows
Ann: Total Depth reached & additional zones of strong gas shows, page-175
-
-
- There are more pages in this discussion • 714 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.5¢ |
Change
-0.004(5.80%) |
Mkt cap ! $93.58M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.5¢ | $139.0K | 2.101M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 794955 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 211386 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 794955 | 0.064 |
2 | 140538 | 0.063 |
4 | 285000 | 0.062 |
4 | 289000 | 0.061 |
10 | 1498389 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 211386 | 3 |
0.066 | 200000 | 1 |
0.068 | 494634 | 1 |
0.069 | 421548 | 2 |
0.070 | 482500 | 3 |
Last trade - 11.17am 24/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online