"Agreed, they’d be crazy not to get that extra data while they are there with the rig."
That's pretty much how I see things.
- M2 is the best location to evaluate as deep into the basin as possible.
- Running a basic slimhole wireline logging operation in the 6" hole will minimize risk of losing a logging string.
- Worst case scenario if 6" hole ends up with junk in it this won't affect ability to flow test the well.
- Forums
- ASX - By Stock
- IVZ
- Ann: Total Depth reached & additional zones of strong gas shows
Ann: Total Depth reached & additional zones of strong gas shows, page-177
-
-
- There are more pages in this discussion • 712 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.5¢ |
Change
-0.004(5.80%) |
Mkt cap ! $92.16M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.3¢ | $224.0K | 3.422M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 95613 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 5326 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 95613 | 0.063 |
3 | 375000 | 0.062 |
5 | 108786 | 0.061 |
11 | 1615055 | 0.060 |
4 | 850000 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 5326 | 1 |
0.067 | 100000 | 1 |
0.068 | 494634 | 1 |
0.069 | 734009 | 2 |
0.070 | 482500 | 3 |
Last trade - 16.10pm 24/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |