So as we are rabbitting on about this and I'm now thinking about it. Six things come to mind in preparation for the news.
1. Are the massive sulphides parallel or down plunge?
2. Can true width now be estimated?
3. Is there any chance they can get at least 30000t of chalcopyrite (10K t Cu) out of just that pipe(s) to bother digging it up and dumping it over the lease boundary?
4. But how much copper at whatever grade is actually needed to re-rate the stock?
5. What are they not telling us (if anything) that limits prospectivity? (always ponder clause 5).
6. What technical details are they telling us that enhances prospectivity? (always ponder clause 6).
- Forums
- ASX - By Stock
- Ann: Trading Halt
So as we are rabbitting on about this and I'm now thinking about...
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OAU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.001(16.7%) |
Mkt cap ! $49.98M |
Open | High | Low | Value | Volume |
0.6¢ | 0.7¢ | 0.6¢ | $528.7K | 83.64M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 34422622 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 15943250 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 30255956 | 0.006 |
17 | 32866686 | 0.005 |
13 | 21980397 | 0.004 |
7 | 3990003 | 0.003 |
7 | 6070398 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 11943250 | 5 |
0.008 | 12736005 | 8 |
0.009 | 2435271 | 5 |
0.010 | 5567134 | 7 |
0.011 | 1700000 | 2 |
Last trade - 15.59pm 13/09/2024 (20 minute delay) ? |
Featured News
OAU (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online