WOW!
"
This preliminary study shows the potential for annual average gold production of approximately 67kozpa for 7.6yrs (509koz recovered) with LOM All‐In Sustaining Costs (AISC) of approximatelyUS$569/oz and peak capital requirement of approximately US$16m. This development would have ashort payback time (approximately 7.4 months) and construction period (approximately 10 months). Within the parameters of the Scoping Study limitations (± 25‐30% accuracy) Theta Hill shows a post‐taxNPV7.5 of approximately US$152m (approximately A$214m) and IRR of approximately 132%."
- Forums
- ASX - By Stock
- Ann: Trading Halt
WOW!"This preliminary study shows the potential for annual...
Featured News
Add TGM (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $103.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 200136 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 30553 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 136 | 0.145 |
2 | 28696 | 0.140 |
3 | 66500 | 0.135 |
3 | 38000 | 0.130 |
2 | 52013 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 30553 | 2 |
0.160 | 108000 | 2 |
0.165 | 23488 | 1 |
0.170 | 8000 | 1 |
0.180 | 20000 | 1 |
Last trade - 16.12pm 25/06/2024 (20 minute delay) ? |
Featured News
TGM (ASX) Chart |
Day chart unavailable