I'm sure that there will be 2 or possibly 3 vessels assigned to the rig (probably 2). One will be there at all times as a 'safety' measure, and the other will be running in and out of Hedland or Karratha for supplies. If we presume that the 8.5" section has been drilled to final depth of around 4500m, then you'd expect one of the boats to be bringing the 7" liner and drilling equipment for the smaller hole section, 6" or 6.125". In fact, you'd think those items would already be at the rig, so there's no reason as to why 1 or 2 vessels would not be alongside. Sorry if I'm missing something.
- Forums
- ASX - By Stock
- CVN
- Ann: Trading Halt
Ann: Trading Halt, page-234
-
- There are more pages in this discussion • 254 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
16.0¢ | 16.5¢ | 15.5¢ | $478.3K | 3.010M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6210 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 482885 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6210 | 0.160 |
5 | 400986 | 0.155 |
16 | 1260527 | 0.150 |
9 | 789088 | 0.145 |
6 | 641706 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 482885 | 6 |
0.170 | 1073194 | 9 |
0.175 | 421485 | 8 |
0.180 | 1316600 | 10 |
0.185 | 1036265 | 11 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |