SGQ 5.56% 1.9¢ st george mining limited

Some key words imho from the announcements after the last...

  1. 122 Posts.
    lightbulb Created with Sketch. 174

    Some key words imho from the announcements after the last trading halt … its in the detail


    20/6


    Proceeds to fund Phase 2
    of the 2019 exploration programme


    The Placement will enable St George to further advance the 2019 exploration programme


    The new funds raised under the Placement have strengthened our balance sheet ahead of commencing the exciting Phase 2 of our 2019 drill programme at Mt Alexander.

    established a strong foundation from which to further grow the scale of the high‐grade nickel‐ copper sulphide discoveries at Mt Alexander


    27/6


    New funds will support the upcoming drill programme


    Funds from the placement will fund upcoming exploration at St George’s Mt Alexander Project and other projects as well as working capital and general corporate expenses.


    9/7


    A drill programme is scheduled to commence at Mt Alexander on or about 22 July 2019. Approximately 6,000m of drilling is planned, with additional metres likely to be added as further targets are prioritised for drilling


    Drilling is scheduled to commence on or about 22 July 2019


    Our technical team is at Mt Alexander this week to finalise sitepreparations. Further details of the planned drill holes will be provided priorto commencement of drilling


    11/7


    “We are also excited to have commenced a new and optimised EM programme on the western section of the Cathedrals Belt, which we believe is likely to generate more EM targets for drilling.”


    The nature and depth of the cover, particularly at West End, has the ability to conceal ore-bodies. A new EM programme has been designed to see below the conductive cover. This will use high powered MLEM and fixed-loop EM (FLEM) surveys. The MLEM survey will utilise both traditional and Slingram configurations – the latter uses a sensor inside and outside of the survey loop, which results in the effects of palaeo-drainage and conductive cover being minimised


    Figure 4 shows the areas to be surveyed in the current EM programme. The programmeis expected to be completed within approximately two weeks


    Any targets generated by the EM programme will included in the upcomingdrill programme for Mt Alexander.


    A largesoil survey is being planned for the broader area of the Fish Hook Prospect. The survey is scheduled to commencelater this month, following which an EM survey will be designed for Fish Hook to search for bedrock conductors at depth below the cover.

    Eagerly awaiting the release of hole sequences and the review of the new EM programme which will hopefully highlight more targets to be included and the overlap of investigators will calibrate and increase the accuracy and precision … going to be threading the needle ,staving off the predators and independent all the way


    Thanks JP for getting the funds now ! whether it translates to another more rig I would be surprised but welcome if so. Think this is the first time with more than one rig at the same time . best time to raise into a monster program . may get a blowoff low into some results by the end of next week if they start on time . these funds add to all the comments above …. And guess what there will be more but hopefully at a much higher price . Not much if any mention of being FULLY funded since the last TH and funding arrangements


    How freakin exciting …huge program and I reckon may even see one at fishhook before this programme is done. gamechanger if the new Em comes off . liking he new eyes and expertise both internal and consulting along with newexco expertise . the finances are unusually muddled but will leave it to JP and the team . he knows whose been a knocking and sniffin round and what he’s got his hands on . Unique and being unlocked


    Cashed up and good to go . get that xrf gun busy.


    Nickel price rising and turned plus add the 30% premium $$$ for the clean product ( no As or MgO ) with all the credits Co PGE . hang tight don’t get
    shaken out


    This is my research… all imho …dyor bring on the drillbits


    Good Fortune to All


    Nickel69

 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
0.001(5.56%)
Mkt cap ! $18.78M
Open High Low Value Volume
1.7¢ 1.9¢ 1.6¢ $18.08K 1.066M

Buyers (Bids)

No. Vol. Price($)
1 403205 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
1.9¢ 78604 1
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
1.7¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
1.7¢ 1.7¢ 1.7¢ 138559
Last updated 13.29pm 03/05/2024 ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.