PET 0.00% 2.5¢ phoslock environmental technologies limited

I think the answer is in the directors report.After evaluation...

  1. 179 Posts.
    lightbulb Created with Sketch. 23
    I think the answer is in the directors report.

    After evaluation of many options, a 12600 square metre,one level manufacturing facility in Changxing,1 km
    from existing factory will be built after they have now acquired the land.
    Need to read the report.
 
watchlist Created with Sketch. Add PET (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.