Ten new geological resource holes for 1,700 m of diamond drilling will be conducted on the Roche Dure pit floor with drilling expected to commence in late September. This will upgrade some Inferred Resources up to at least an Indicated Resource status. The updated geological resource is not expected to increase overall resource tonnes but the current combined Indicated and Measured resource tonnage is expected to increase. Assay results are expected in November 2020 if the drilling can be completed by the end of October 2020.