As hydroxy technology continues to develop and costs are being optimized, we can reckon on an own hydroxy plant near Manono in 2-3 years after starting to mine. This would make as the biggest and by far highest margin deposit. Due to the size a hydroxy plant at Manono is economically very well covered.
- Forums
- ASX - By Stock
- AVZ
- Ann: Trading Halt
Ann: Trading Halt, page-76
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)