As hydroxy technology continues to develop and costs are being optimized, we can reckon on an own hydroxy plant near Manono in 2-3 years after starting to mine. This would make as the biggest and by far highest margin deposit. Due to the size a hydroxy plant at Manono is economically very well covered.
- Forums
- ASX - By Stock
- Ann: Trading Halt
As hydroxy technology continues to develop and costs are being...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online