$110m covers CAPEX on the Warrawoona construction, we'll need to cover the Blue Spec purchase, plus OPEX on drilling across the priority sites at Warrawoona, Otway, Blue Spec scoping and the new farm in agreement.
I don't think the raise will need to be as large as some have speculated.
- Forums
- ASX - By Stock
- Ann: Trading Halt
$110m covers CAPEX on the Warrawoona construction, we'll need to...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable