As REL announced previously, the Tulainyo 2-7 well was drilled to the planned total depth of 5,710 feet (1,740 metres). This represented a significant engineering achievement by the Tulainyo joint venture due to the challenging over–pressured geological conditions within the very large anticlinal structure.
Post-well analysis indicates multiple stacked sandstone units, varying as expected in thickness and quality, that are all gas saturated.
A two-stage test program will now be carried out, with perforations into the selected reservoir intervals using Tubing Conveyed Perforating Equipment or TCPs. Testing will commence across a zone lower in the well with perforations across at least three separate sands with varying, interpreted reservoir quality. Once sufficient data has been captured from the first test, a removable bridge plug will be set to isolate the lower test zone, and a second test will be conducted over a shallower, thicker sand package.
Overall, the program is expected to take around one month to complete. REL will release further information to the market once test results are clarified.
- Forums
- ASX - By Stock
- XST
- Ann: Trading Halt
Ann: Trading Halt, page-81
-
-
- There are more pages in this discussion • 205 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
XST (ASX) Chart |
Day chart unavailable