Given that the lower Kingia maybe less permeable sand being in contact with the upper 20m very high perm sands, over such enormous area I would have thought NWE could drain gas from both layers through the 20m pay zone. The area to drain to well bore must be so insignificant compared to the contact area of the two Kingia layers that effectively all the gas' would flow from lower Kingia.. Choke point is the well bore?
NWE Price at posting:
2.7¢ Sentiment: Buy Disclosure: Held