1. RC Drilling Results
2. Reserve Estimation
3. Resource Upgrade
4. Pilot Study Test Work Results
5. Sino Steel Binding Offtake
6. Big Pawer Binding Offtake
7. LE Systems Binding offtake
8. Shanxi Fengyuan Binding Offtake
9. Offtake for the remainder of the GVP production (3000 Tonnes) (thinking LE systems as per the announcement slides bottom of page 16)
10. Gas Supply MOU Conversion with OPEX reduction and DFS Opex upgrade to $3.xx (APA)
11. Testwork on Non-Magnetic Tailing Confirmation of the Titanium Circuit for Yarrabubba (Improved Titanium Metrics > 50 % product)
12. Environmental Submission Approved
13. Yarrabubba DFS (Expecting Cost CAPEX AND OPEX reduction from initial bridge street estimates)
14. Funding Announcement with (NAIF)
15. FID Decision for (Yarrabubba)
16. VRFB Electrolyte Plant Conversion with LE systems
Troydt can probably use an assistant so here is me playing the part today